Master production schedule:
"Anticipated build schedule (must be realistic rather than optimistic) which defines the quantities of the finished products required and the associated due dates. (master production schedule (MPS) , The anticipated build schedule for those items assigned to the master scheduler. It is a set of planning numbers that drives material requirements planning (MRP). It represents what the company plans to produce expressed in specific configurations, quantities, and dates.)"